ProjectsBohnice · 68 m² · 7 weeks

Bohnice panel apartment — full renovation from 3+kk to 3+1

Full gut-and-rebuild of a 3+kk panel apartment in Bohnice (68 m²) reconfigured to 3+1: complete strip-out including the original prefab plastic wet core, new partition for a separate kitchen, new masonry wet core, all-new electrics, water and drainage, heating adjustments, bathroom, separate WC, bespoke kitchen, floors, tiling, paint, interior doors, and turnkey handover.

Bohnice panel apartment — full renovation from 3+kk to 3+1
  • 68 m²Size
  • 7Weeks
  • BohniceLocation

Before / after

Same project. Documentation-grade shots, not a stock montage.

Bohnice panel apartment — full renovation from 3+kk to 3+1

Brief

68 m² 3+kk panel apartment in Bohnice — goal was a 3+1 layout with the kitchen separated from the living room. This was a full gut renovation: the original fit-out and the prefab plastic wet core (umakart) went out completely, leaving bare structure and risers. We rebuilt from scratch — new partitions for the new layout, a new masonry wet core, all-new services, finishes throughout, and a separate WC split from the bathroom.

Scope

  • Full interior strip-out within the unit; protection of common areas; lawful waste removal
  • Removal of the original prefab plastic-laminate wet core including its sanitary services; preparation for a new masonry build-up
  • New 3+1 layout — partition wall to separate the kitchen, new door openings and frames, in line with the SVJ-approved changes and the structural rules of the panel building
  • New masonry wet core (separate bathroom and separate WC) tied into the existing risers
  • New electrical installation — apartment panel, circuits to design, full cabling, sockets, switches, kitchen, bathroom, lighting and appliance provisions
  • New cold/hot water and drainage in the bathroom, WC and kitchen; pressure tests and compliance paperwork
  • Heating distribution adjusted on affected runs; connection to the building risers
  • Window replacement including sills and sealing
  • Bathroom: waterproofing, tiling, sanitaryware, brassware, shower or bath, ventilation
  • Separate WC with wall and floor tiling and sanitaryware
  • Bespoke kitchen including appliances and water/drain/electrical hook-ups
  • Floor levelling, build-ups, and final finishes in living rooms, hall and kitchen
  • Plaster, skim, and full interior paint including ceilings
  • New interior doors, frames, and ironmongery; light fittings, final clean, and handover

Timeline

Survey: day 0. Quote: day 5. Contract: day 12. Start: day 21. Handover: week 7.

Project photos

Selected shots from the build and final handover.